Bathroom renovation: to Begin

0
0

The bathroom is an area with particular requirements: high humidity, humidity differences. That’s why making fixes in the bathroom, you need to clearly plan the whole working process, to think about the sequence of steps to be achieved. Within this report, you will learn the way to begin the repair in the bathroom and what types of work ought to be carried out with your own hands. Step-by-step directions for toilet repair

Phase 1: drawing up a strategy and deciding upon a layout solution.

Fix in the bathroom can be of two types:

  • Unplanned, spontaneous, arising from the will of unforeseen circumstances. For instance, in case of a pipe burst, flooding by neighbors.
  • Planned, which can be either cosmetic or capital. It requires planning, serious fiscal investment and time.

Begin repairs in the toilet is to ascertain the plan, interior. Think through to the last detail, what will be the room, pick a color. Pastel colours are conventional, as well as a blend of blue and blue, or cherry with beige.

Begin repairs in the bathroom is to ascertain the plan, interior layout. Think in detail, what’s going to be the space, pick a colour. Pastel colors are considered traditional, as well as a mix of colors.

The next point is the choice of facing material. Generally, finishing at the toilet is done with tile, porcelain tiles, mosaic, plastic panels. Check the plumbing, if it ought to be replaced. If needed, choose the right option. Proceed to the measuring work: quantify all sides, calculate the area of the room. Based on these data, we indicate the location of these plumbing fixtures.

Step 2: the choice of sanitary fixtures and substance for completing.

It’s very important to see that the purchase of sanitary ware simplifies the planning stage, and not vice versa. This means that first we create a design project, make a plan, and then go to the shop. Another point – you should specify how big your favourite plumbing fittings and inspect the plan, whether it fits.

It’s very important to see that the cost of plumbing fixtures is preceded by a preparation period, rather than vice versa. This means that first we create a new design project, create a plan, and then go to the store. Another one

As for materials for completing, it is better to purchase them instantly for the whole repair cycle, in order that then you won’t be distracted if something has been missing. Remember about preparing the vital tools.

Measure 3: dismantling plumbing and tiling.

After All of the preliminary work has been done, proceed to the beginning of the task process:

  • Remove the sink and bathtub from the area, even though they won’t be vsyakuhnya.ru replaced with new ones. In this way, you can keep them clean and undamaged.
  • Eliminate the old tile, cleaning following it all surfaces: walls, ceiling, floor.
  • Remove paint from the walls, if they were previously painted, because the adhesive solution or a fresh layer of paint will not stick to the surface.

Measure 4: replacement of communications: plumbing, electrical wiring.

Very often in an old house, you ought to carefully inspect and replace not only the pipes which are in the bathroom itself, but also the principal riser, and sometimes the interfloor plumbing. Why is it worth doing this? Old pipes at any time can give a leak, and then the new fix will be emptied, it will require additional investment to eliminate flaws.